GitHub Project Board¶
Project 40 — Calculator CO2
is where the work is tracked. This page is the field reference: what each
column means, which values are live, and which are dead weight. Code rules
live in guardrails.md.
Snapshot: 2026-08-31 — 811 items, 19 fields, 13 views, public.
Project ID PVT_kwDOA62qLM4BE4-5.
Fields¶
| Field | Type | Values | Items set |
|---|---|---|---|
| Status | single-select | Backlog → Comité Spécialisé → Ready → In progress → In review → Ready for validation → QA Validation → Tests Metier → Validated | 770 |
| Priority | single-select | P0, P1, P2, P3 | 496 |
| Sprint | iteration | 14 days, Monday start | 696 |
| Est. hours | number | 0.5 / 1 / 2 / 3 / 4 / 6 / 8 / 16 ladder | 382 |
| Category | single-select | FEAT, TASK, SPECS, DESIGN, DOC, TEXT, FIX, DATA | 250 |
| Module | single-select | Purchases, Headcount, Travel, Research facilities, ExternalCloudsAI, Equipments, Processes, Buildings, Generic, BackOffice, Results, Simulation | 249 |
| Size | single-select | XS, S, M, L, XL — dead, use Est. hours | 16 |
| Assignees, Labels, Linked PRs, Reviewers, Repository, Parent issue, Sub-issues progress, Created/Updated/Closed | built-in | — | |
| Milestone | built-in | never used | 0 |
Two repositories feed the board: co2-calculator (808 items) and
co2-calculator-back-office-doc (3).
Status flow¶
Backlog and Comité Spécialisé hold unrefined work — the latter is for
items needing a business-committee decision. Ready means specced and
estimated. After In review (code review), an item goes to
Ready for validation, then QA Validation (IT4R), then Tests Metier
(business testing), then Validated.
| Status | Items | Priority | Items | |
|---|---|---|---|---|
| Validated | 720 | P0 | 202 | |
| (empty) | 41 | P3 | 111 | |
| Ready | 12 | P1 | 106 | |
| Ready for validation | 12 | P2 | 77 | |
| QA Validation | 12 | (empty) | 315 | |
| Backlog | 5 | |||
| In progress | 3 | |||
| Tests Metier | 3 | |||
| In review | 2 | |||
| Comité Spécialisé | 1 |
Category and Module are set on roughly a third of items — Module is the useful one for cross-cutting queries (Results 52, BackOffice 50, Generic 38, Travel 27, Equipments 25, Headcount 16, ExternalCloudsAI 11, Buildings 11, Purchases 8, Processes 5, Research facilities 4, Simulation 2).
Sprints¶
Cadence settled at exactly 14 days from Sprint 8 onward; earlier sprints ran 16–32 days.
| Sprint | Start | Days | Items |
|---|---|---|---|
| Post-delivery | 2026-09-07 | 14 | 23 |
| Delivery | 2026-08-24 | 14 | 93 |
| Simulator Sprint 3 (QA & Fixes) | 2026-08-10 | 14 | 74 |
| Simulator Sprint 2 | 2026-07-27 | 14 | 29 |
| Simulator Sprint 1 | 2026-07-13 | 14 | 15 |
| Sprint de Refactor | 2026-06-29 | 14 | 55 |
| Delivery v1.0 & Hot fixes | 2026-06-17 | 12 | 15 |
| Sprint 12 (QA & Fixes) | 2026-06-03 | 14 | 72 |
| Sprint 11 (QA & Fixes) | 2026-05-20 | 14 | 46 |
| Sprint 10 | 2026-05-05 | 15 | 54 |
| Sprint 9 | 2026-04-14 | 21 | 31 |
| Sprint 8 | 2026-03-31 | 14 | 26 |
| Sprint 7 | 2026-03-10 | 21 | 27 |
| Sprint 6 | 2026-02-11 | 27 | 25 |
| Sprint 5 | 2026-01-20 | 22 | 16 |
| Sprint 4 | 2025-12-19 | 32 | 21 |
| Sprint 3 | 2025-12-03 | 16 | 19 |
| Sprint 2 | 2025-11-19 | 14 | 26 |
| S1 - Set up | 2025-10-27 | 23 | 28 |
| Preliminary work (S0) | 2025-10-19 | 8 | — |
115 items carry no sprint.
Labels¶
Type labels double as branch prefixes — bug → fix/, feat → feat/,
and so on. The MoSCoW set (Must have / Should have / nice to have) is
orthogonal to the Priority field and predates it.
| Label | Purpose | Used |
|---|---|---|
bug |
Something isn't working — branch fix/ |
165 |
Must have |
MoSCoW | 87 |
nice to have |
MoSCoW | 55 |
Should have |
MoSCoW | 26 |
non-conforme |
QA: shipped behaviour doesn't match spec | 26 |
feat |
New feature — branch feat/ |
21 |
issue in definition |
Draft issue, specs being clarified | 15 |
refactor |
Branch refactor/ |
7 |
Cannot reproduce |
QA outcome | 6 |
Blocking |
Blocking for tests, needed ASAP | 4 |
docs |
Branch docs/ |
3 |
perf |
Branch perf/ |
2 |
python, javascript, python:uv, dependencies |
Dependabot area tags | 2 |
wontfix |
Won't be worked on | 1 |
polish |
UI/UX/phrasing cleanup under 30 min — branch polish/ |
0 |
style, test |
Branches style/, test/ |
0 |
Comité |
À rediscuter en comité | 0 |
ai-review |
Flagged for AI review | 0 |
autorelease: pending, autorelease: tagged |
release-please automation | 0 |
Views¶
| # | Name | Layout | Filter | Group / sort |
|---|---|---|---|---|
| 1 | Current sprint dev | board | sprint:@current -title:*spec* |
— |
| 2 | Next sprint | board | sprint:@next assignee:BenBotros |
— |
| 3 | Prioritized backlog | table | is:open |
Sprint / Priority ↑ |
| 4 | Roadmap | roadmap | — | — |
| 5 | In review | table | status:"In review" |
— |
| 6 | My items | table | assignee:@me |
— |
| 7 | Everything | table | is:open |
Sprint / Priority ↑, Status ↓ |
| 8 | Pour Agnès | table | assignee:agletiec -status:Validated |
Sprint |
| 10 | Previous sprint | board | sprint:@previous |
— |
| 11 | Specs progress | board | specs |
Sprint ↑ |
| 12 | QA | table | status:"QA Validation" |
Sprint |
| 14 | Vue de Caro | board | is:open minus sprints S0 → Sprint 6 |
Sprint |
| 15 | VueCaro | board | -status:"Ready for validation","In progress",Ready,"In review" |
— |
Automations¶
Four built-in workflows, all enabled: Item closed, Pull request merged, Auto-close issue, Auto-add sub-issues to project. Opening a sub-issue therefore puts it on the board without anyone touching it.
Rough edges¶
- Module has two
Genericoptions (48fab104,d7efe70b) — the same bucket silently split in two. Merge them. - Size is dead (16 of 811 items); Est. hours replaced it. Delete the field.
- Views 14 and 15 are near-duplicates, and view 14's filter hardcodes a
sprint denylist that needs hand-editing every sprint. A
-sprint:@previous-style filter or a status filter would self-maintain.
Querying the board¶
gh project view 40 --owner EPFL-ENAC --format json
gh project field-list 40 --owner EPFL-ENAC --format json
gh project item-list 40 --owner EPFL-ENAC --limit 1000 --format json
Iteration dates, view filters, and automations are GraphQL-only:
gh api graphql -f query='query{organization(login:"EPFL-ENAC"){projectV2(number:40){
field(name:"Sprint"){... on ProjectV2IterationField{configuration{
iterations{title startDate duration}
completedIterations{title startDate duration}}}}
views(first:30){nodes{number name layout filter}}